The wire threading equipment line supplies materials, and the products are stopped by the blocking cylinder as they flow into the equipment. The products are positioned for relative location using a lift-up and side-clamp method. The pneumatic cylinder module, equipped with copper pillars, performs electrical insulation resistance testing on the products. After the test is completed, the products flow to the next station for continuity testing.
Supporter
Sign in to download
This is a Supporter item. Sign in to access it with free daily limits — or subscribe for unlimited access.