Instructions
1. This workstation adopts a single robot with a dual-station servo positioner welding layout;
2. The welding materials are manually placed and initially positioned.
3. This workstation is equipped with a total of 1 person, as follows;
1) Machine operation - material loading/unloading 1 person;
4. Production cycle: lower beam 15 minutes/piece
Already in use
Supporter
Sign in to download
This is a Supporter item. Sign in to access it with free daily limits — or subscribe for unlimited access.