This blueprint has already been put into production, for a heavy-duty mobile upgrade platform. The platform moves along the track, which is pre-embedded at the construction site. The body lift uses hydraulic struts, and both the body and platform strength have undergone rigorous strength verification. The maximum load strength of the A1912-01-03 slewing carrier is around 3T. SolidWorks 2018 drawing with parameters is editable.
Supporter
Sign in to download
This is a Supporter item. Sign in to access it with free daily limits — or subscribe for unlimited access.