During the production process of the relay, the products need to be tested after being produced. The products flow into the device through the assembly line. To achieve higher efficiency, an upstream workstation method is used to conduct pressure retention and other tests. Once testing is complete, products automatically flow out.
Supporter
Sign in to download
This is a Supporter item. Sign in to access it with free daily limits — or subscribe for unlimited access.