The latter part of the transformer production line includes functionality testing, transfer output, inspection and sorting, and reflow testing. The entire machine constitutes a complete production line with powerful capabilities. The drawings are original CAD files that contain parameters and editable documents. The equipment is already in mass production, and all the parts have been machined based on the drawings. They can be directly downloaded and used, making them worthy of collection and reference.
Supporter
Sign in to download
This is a Supporter item. Sign in to access it with free daily limits — or subscribe for unlimited access.